top of page

Central Railway Announces Mega Block on Mumbai Division on May 19, 2024


Mumbai, – Central Railway, Mumbai Division, will conduct a Mega Block on its suburban sections for engineering and maintenance works on Sunday, May 19, 2024. The block will affect the UP and DOWN FAST lines between Matunga and Mulund stations from 11:05 am to 3:55 pm. Services on these lines will be diverted to the SLOW lines, causing a delay of approximately 15 minutes.

Additionally, the UP and DOWN HARBOUR lines between Kurla and Vashi will be blocked from 11:10 am to 4:10 pm. Consequently, services between CSMT Mumbai and Panvel/Belapur/Vashi during these hours will be cancelled. Special suburban trains will operate between CSMT Mumbai and Kurla, and Panvel and Vashi sections during the block period.

Passengers are permitted to travel between Thane and Vashi/Nerul from 10:00 am to 6:00 pm during the block. The Railway Administration has requested passengers to bear with the inconvenience for the sake of essential infrastructure upkeep and safety.

Comments


bottom of page